Manufacturer · HCAI/OSHPD OSP
Industrial Electric Mfg. — OSP Preapprovals
All 6 HCAI/OSHPD Special Seismic Certification preapprovals issued for Industrial Electric Mfg. equipment. 3 active, 3 expired. Source data from HCAI · updated 2026-04-21.
Equipment categories from Industrial Electric Mfg.
About Industrial Electric Mfg. OSP preapprovals
Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Industrial Electric Mfg. equipment? Talk to a Panache engineer.
Need PE/SE-stamped anchorage for Industrial Electric Mfg. OSP-listed equipment (Iₚ = 1.5)?
PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.
