Manufacturer · HCAI/OSHPD OSP

Multistack — OSP Preapprovals

All 2 HCAI/OSHPD Special Seismic Certification preapprovals issued for Multistack equipment. 2 active, 0 expired. Source data from HCAI · updated 2026-04-21.

Equipment categories from Multistack

OSP #Sub-CategoryExpires
OSP-0150Chillers – Water Cooled9/26/2030Details →
OSP-0624Chillers – Air Cooled4/18/2029Details →

About Multistack OSP preapprovals

Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Multistack equipment? Talk to a Panache engineer.

Need PE/SE-stamped anchorage for Multistack OSP-listed equipment (Iₚ = 1.5)?

PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.