Manufacturer · HCAI/OSHPD OSP

Parker Boiler Co. — OSP Preapprovals

All 1 HCAI/OSHPD Special Seismic Certification preapprovals issued for Parker Boiler Co. equipment. 1 active, 0 expired. Source data from HCAI · updated 2026-04-21.

Filter:AllActive onlyExpired onlyShowing 1 of 1
OSP #Sub-CategoryExpires
OSP-0448Boiler Control Panels12/19/2031Details →

About Parker Boiler Co. OSP preapprovals

Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Parker Boiler Co. equipment? Talk to a Panache engineer.

Need PE/SE-stamped anchorage for Parker Boiler Co. OSP-listed equipment (Iₚ = 1.5)?

PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.