Manufacturer · HCAI/OSHPD OSP

Perfect Power Systems — OSP Preapprovals

All 2 HCAI/OSHPD Special Seismic Certification preapprovals issued for Perfect Power Systems equipment. 2 active, 0 expired. Source data from HCAI · updated 2026-04-21.

Filter:AllActive onlyExpired onlyShowing 2 of 2

Equipment categories from Perfect Power Systems

OSP #Sub-CategoryExpires
OSP-0501Lighting Inverter Systems5/4/2028Details →
OSP-0661UPS7/31/2031Details →

About Perfect Power Systems OSP preapprovals

Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Perfect Power Systems equipment? Talk to a Panache engineer.

Need PE/SE-stamped anchorage for Perfect Power Systems OSP-listed equipment (Iₚ = 1.5)?

PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.