Manufacturer · HCAI/OSHPD OSP

Trane — OSP Preapprovals

All 25 HCAI/OSHPD Special Seismic Certification preapprovals issued for Trane equipment. 11 active, 14 expired. Source data from HCAI · updated 2026-04-21.

Filter:AllActive onlyExpired onlyShowing 11 of 25

Equipment categories from Trane

OSP #Sub-CategoryExpires
OSP-0128Chillers – Air Cooled12/14/2027Details →
OSP-0137Variable Frequency Drives and Starters10/26/2028Details →
OSP-0168Chillers – Water Cooled10/10/2028Details →
OSP-0238Air Conditioning Units – Packaged10/1/2031Details →
OSP-0242Air Conditioning Units – Custom4/12/2028Details →
OSP-0347Air Conditioning Units – Split9/30/2027Details →
OSP-0541Chillers – Water CooledCancelledDetails →
OSP-0548Chillers – Water Cooled10/10/2028Details →
OSP-0610Chillers – Water Cooled12/14/2027Details →
OSP-0745Variable Frequency Drives and Starters9/14/2028Details →
OSP-0823Chillers – Air Cooled10/29/2030Details →

About Trane OSP preapprovals

Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Trane equipment? Talk to a Panache engineer.

Need PE/SE-stamped anchorage for Trane OSP-listed equipment (Iₚ = 1.5)?

PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.