OSP-0106

Expired

GE

Motor Control Centers – Medium Voltage

OSP Number
OSP-0106
Manufacturer
GE
Sub-Category
Motor Control Centers – Medium Voltage
Category
6. Motor Control Centers
Expiration
Expired
HCAI Document
Not available

Seismic Parameters (per HCAI certificate)

Certified limit shown exactly as it appears in the certificate field “Special Seismic Certification Valid Up to”. z/h = 1 is the roof level and z/h = 0 is the building base per ASCE 7 §13. Always confirm against the original HCAI certificate before specifying.

Seismic parameters for this OSP could not be read reliably from the HCAI certificate, so no values are shown. Refer to the HCAI certificate for the certified SDS and z/h limits.

Need help with OSP-0106?

PANACHE ENGINEERING provides PE/SE-stamped seismic anchorage calculations, supports & attachments design, and HCAI submittal packages for GE motor control centers – medium voltage and similar OSP-listed equipment in California hospitals.

Other active OSPs in Motor Control Centers – Medium Voltage

Need PE/SE-stamped anchorage for GE motor control centers – medium voltage (Iₚ = 1.5)?

PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.