OSP-0121

Active

Cooper Power Systems

Transformers – Liquid Filled

OSP Number
OSP-0121
Manufacturer
Cooper Power Systems
Sub-Category
Transformers – Liquid Filled
Category
13. Transformers
Expiration
10/25/2028
HCAI Document
View on HCAI

Seismic Parameters (per HCAI certificate)

Certified limit shown exactly as it appears in the certificate field “Special Seismic Certification Valid Up to”. z/h = 1 is the roof level and z/h = 0 is the building base per ASCE 7 §13. Always confirm against the original HCAI certificate before specifying.

Seismic parameters for this OSP could not be read reliably from the HCAI certificate, so no values are shown. See the HCAI certificate for the certified SDS and z/h limits.

Need help with OSP-0121?

PANACHE ENGINEERING provides PE/SE-stamped seismic anchorage calculations, supports & attachments design, and HCAI submittal packages for Cooper Power Systems transformers – liquid filled and similar OSP-listed equipment in California hospitals.

Other active OSPs in Transformers – Liquid Filled

Need PE/SE-stamped anchorage for Cooper Power Systems transformers – liquid filled (Iₚ = 1.5)?

PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.