OSP-0499
Crucial Power
Lighting Inverter Systems
- OSP Number
- OSP-0499
- Manufacturer
- Crucial Power
- Sub-Category
- Lighting Inverter Systems
- Category
- 15. UPS and Batteries
- Expiration
- 5/4/2028
- HCAI Document
- View on HCAI
Seismic Parameters (per HCAI certificate)
Certified limit shown exactly as it appears in the certificate field “Special Seismic Certification Valid Up to”. z/h = 1 is the roof level and z/h = 0 is the building base per ASCE 7 §13. Always confirm against the original HCAI certificate before specifying.
Seismic parameters for this OSP could not be read reliably from the HCAI certificate, so no values are shown. See the HCAI certificate for the certified SDS and z/h limits.
Need help with OSP-0499?
PANACHE ENGINEERING provides PE/SE-stamped seismic anchorage calculations, supports & attachments design, and HCAI submittal packages for Crucial Power lighting inverter systems and similar OSP-listed equipment in California hospitals.
Other active OSPs in Lighting Inverter Systems
- OSP-0258Myers Emergency Power SystemsExpires 9/26/2028SDS 2.50gz/h 1.00
- OSP-0305Myers Emergency Power SystemsExpires 10/4/2028SDS 2.50gz/h 1.00
- OSP-0365Current LightingExpires 4/1/2032
- OSP-0496Myers Emergency Power SystemsExpires 9/26/2028SDS 2.00gz/h 1.00
- OSP-0500Online PowerExpires 5/4/2028
- OSP-0501Perfect Power SystemsExpires 5/4/2028
Need PE/SE-stamped anchorage for Crucial Power lighting inverter systems (Iₚ = 1.5)?