OSP-0507

Active

Spellman

Power Distribution Units

OSP Number
OSP-0507
Manufacturer
Spellman
Sub-Category
Power Distribution Units
Category
16. Panelboards
Expiration
10/10/2028
HCAI Document
View on HCAI

Seismic Parameters (per HCAI certificate)

Maximum design parameters under which this OSP was certified per ASCE 7 §13. Verify against the original HCAI document before specifying.

SDS @ z/h = 1.0 (grade)
SDS @ z/h = 0 (roof)
SDS, max (g)
1.00
z/h certified
Front: 16.3 / Side: 13.8 / Vert.: 14.4
Raw SDS string (from certificate)
1

Need help with OSP-0507?

PANACHE ENGINEERING provides PE/SE-stamped seismic anchorage calculations, supports & attachments design, and HCAI submittal packages for Spellman power distribution units and similar OSP-listed equipment in California hospitals.

Other active OSPs in Power Distribution Units

Need PE/SE-stamped anchorage for Spellman power distribution units (Iₚ = 1.5)?

PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.