OSP-0718

Active

Comsys

Power Isolation and Correction Systems

OSP Number
OSP-0718
Manufacturer
Comsys
Sub-Category
Power Isolation and Correction Systems
Category
18. Power Isolation and Correction Systems
Expiration
11/16/2027
HCAI Document
View on HCAI

Seismic Parameters (per HCAI certificate)

Certified limit shown exactly as it appears in the certificate field “Special Seismic Certification Valid Up to”. z/h = 1 is the roof level and z/h = 0 is the building base per ASCE 7 §13. Always confirm against the original HCAI certificate before specifying.

Seismic parameters for this OSP could not be read reliably from the HCAI certificate, so no values are shown. See the HCAI certificate for the certified SDS and z/h limits.

Need help with OSP-0718?

PANACHE ENGINEERING provides PE/SE-stamped seismic anchorage calculations, supports & attachments design, and HCAI submittal packages for Comsys power isolation and correction systems and similar OSP-listed equipment in California hospitals.

Other active OSPs in Power Isolation and Correction Systems

Need PE/SE-stamped anchorage for Comsys power isolation and correction systems (Iₚ = 1.5)?

PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.