Equipment category · HCAI/OSHPD OSP
Air Conditioning Units – Packaged — OSP Preapprovals
All 25 HCAI/OSHPD Special Seismic Certification preapprovals issued for Air Conditioning Units – Packaged. 12 active, 13 expired, across 12 manufacturers. Source data from HCAI · updated 2026-04-21.
Manufacturers with Air Conditioning Units – Packaged OSPs
| OSP # | Manufacturer | Expires | |
|---|---|---|---|
| OSP-0147 | Johnson Controls | 5/11/2028 | Details → |
| OSP-0180 | AAON | 3/20/2030 | Details → |
| OSP-0181 | AAON | 12/8/2028 | Details → |
| OSP-0213 | Johnson Controls Inc. (JCI) | 7/9/2031 | Details → |
| OSP-0238 | Trane | 10/1/2031 | Details → |
| OSP-0249 | Johnson Controls | 2/26/2032 | Details → |
| OSP-0325 | Daikin Applied | 2/11/2032 | Details → |
| OSP-0535 | Johnson Controls, Inc. | 6/12/2031 | Details → |
| OSP-0596 | Lennox Industries Inc. | 8/15/2030 | Details → |
| OSP-0648 | AAON | Cancelled | Details → |
| OSP-0725 | Johnson Controls, Inc | 1/16/2031 | Details → |
| OSP-0742 | Johnson Controls | 12/6/2030 | Details → |
About Air Conditioning Units – Packaged OSP preapprovals
Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Air Conditioning Units – Packaged on a California hospital project? Talk to a Panache engineer.
Need PE/SE-stamped anchorage for air conditioning units – packaged (Iₚ = 1.5)?
PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.
