Equipment category · HCAI/OSHPD OSP

Switchboards — OSP Preapprovals

All 15 HCAI/OSHPD Special Seismic Certification preapprovals issued for Switchboards. 14 active, 1 expired, across 12 manufacturers. Source data from HCAI · updated 2026-04-21.

Filter:AllActive onlyExpired onlyShowing 1 of 15

Manufacturers with Switchboards OSPs

OSP #ManufacturerExpires
OSP-0308Z Power
Expired
Details →

About Switchboards OSP preapprovals

Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Switchboards on a California hospital project? Talk to a Panache engineer.

Need PE/SE-stamped anchorage for switchboards (Iₚ = 1.5)?

PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.