Manufacturer · HCAI/OSHPD OSP
Vertiv — OSP Preapprovals
All 13 HCAI/OSHPD Special Seismic Certification preapprovals issued for Vertiv equipment. 8 active, 5 expired. Source data from HCAI · updated 2026-04-21.
Equipment categories from Vertiv
| OSP # | Sub-Category | Expires | |
|---|---|---|---|
| OSP-0049 | Air Conditioning Units – Data Room | 10/25/2028 | Details → |
| OSP-0101 | UPS | 2/13/2030 | Details → |
| OSP-0182 | Air Conditioning Units – Data Room | 11/1/2028 | Details → |
| OSP-0366 | Air Conditioning Units – Data Room | 10/24/2028 | Details → |
| OSP-0381 | Air Conditioning Units – Data Room | 10/17/2028 | Details → |
| OSP-0556 | UPS | 8/12/2028 | Details → |
| OSP-0571 | UPS | 9/27/2028 | Details → |
| OSP-0674 | UPS | 3/8/2028 | Details → |
About Vertiv OSP preapprovals
Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Vertiv equipment? Talk to a Panache engineer.
Need PE/SE-stamped anchorage for Vertiv OSP-listed equipment (Iₚ = 1.5)?
PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.
