Manufacturer · HCAI/OSHPD OSP
Vertiv — OSP Preapprovals
All 13 HCAI/OSHPD Special Seismic Certification preapprovals issued for Vertiv equipment. 8 active, 5 expired. Source data from HCAI · updated 2026-04-21.
Equipment categories from Vertiv
About Vertiv OSP preapprovals
Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Vertiv equipment? Talk to a Panache engineer.
Need PE/SE-stamped anchorage for Vertiv OSP-listed equipment (Iₚ = 1.5)?
PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.
