Equipment category · HCAI/OSHPD OSP
Paralleling Switchgear Controls — OSP Preapprovals
All 5 HCAI/OSHPD Special Seismic Certification preapprovals issued for Paralleling Switchgear Controls. 2 active, 3 expired, across 5 manufacturers. Source data from HCAI · updated 2026-04-21.
Manufacturers with Paralleling Switchgear Controls OSPs
About Paralleling Switchgear Controls OSP preapprovals
Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Paralleling Switchgear Controls on a California hospital project? Talk to a Panache engineer.
Need PE/SE-stamped anchorage for paralleling switchgear controls (Iₚ = 1.5)?
PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.
