Equipment category · HCAI/OSHPD OSP

Paralleling Switchgear Controls — OSP Preapprovals

All 5 HCAI/OSHPD Special Seismic Certification preapprovals issued for Paralleling Switchgear Controls. 2 active, 3 expired, across 5 manufacturers. Source data from HCAI · updated 2026-04-21.

Filter:AllActive onlyExpired onlyShowing 3 of 5

Manufacturers with Paralleling Switchgear Controls OSPs

OSP #ManufacturerExpires
OSP-0036GE
Expired
Details →
OSP-0165Intelligent Switchgear Organization
Expired
Details →
OSP-0313ABB
Expired
Details →

About Paralleling Switchgear Controls OSP preapprovals

Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Paralleling Switchgear Controls on a California hospital project? Talk to a Panache engineer.

Need PE/SE-stamped anchorage for paralleling switchgear controls (Iₚ = 1.5)?

PANACHE ENGINEERING delivers HCAI-ready seismic anchorage calculations, OPM/OSP submittal packages, and shake-table coordination for California hospital construction. Fixed-fee proposals, ASCE 7-22 Chapter 13 compliant, turnaround typically 5–10 business days.