All 16 HCAI/OSHPD Special Seismic Certification preapprovals issued for Cummins equipment. 11 active, 5 expired. Source data from HCAI · updated 2026-04-21.

Filter:AllActive onlyExpired onlyShowing 11 of 16

Equipment categories from Cummins

OSP #Sub-CategoryExpires
OSP-0267Emissions After-TreatmentCancelledDetails →
OSP-0283Automatic Transfer SwitchesCancelledDetails →
OSP-0446Paralleling Switchgear Controls11/8/2030Details →
OSP-0540Switchgear – Low Voltage5/23/2028Details →
OSP-0595Boiler Control Panels7/15/2031Details →
OSP-0609Generators8/10/2028Details →
OSP-0612Generators10/24/2028Details →
OSP-0623Automatic Transfer Switches9/28/2027Details →
OSP-0671Generators10/3/2028Details →
OSP-0747Generators2/5/2030Details →
OSP-0774Automatic Transfer Switches9/1/2029Details →

About Cummins OSP preapprovals

Listed records are sourced from the official HCAI OSP page. Always verify status, conditions, and expiration with HCAI before specifying a component. Need PE/SE stamped anchorage calculations for Cummins equipment? Talk to a Panache engineer.